ISO 5, 6 & 7 Cleanroom Construction for HDD MPT Factory
Review of the 3,000 sq.m. Built-to-Suit cleanroom project (ISO 5, 6 & 7 standards) for MPT’s HDD factory, with quality guaranteed by NEBB certification.
Scope of Work
Build-to-Suit Cleanroom Design & Construction
Client / Project Name:
MPT (Magnecomp Precision Technology)
Industry:
HDD (Hard Disk Drive)
Standard / Classification:
Cleanroom ISO 5, 6 & 7 (ผ่านการรับรอง NEBB U.S.A)
Project Area:
3,000 Square Meters (m²)
Construction Period:
4 Months
ISO 5, 6 & 7 Built-to-Suit Cleanroom Project: Elevating HDD Production Lines for MPT
VOV International extends our gratitude to MPT (Magnecomp Precision Technology) , a world leader in precision component manufacturing for the Hard Disk Drive (HDD) industry, for trusting us as their partner for cleanroom construction on a customized Built-to-Suit basis. This project is a success that proves our speed and professionalism in elevating large-scale production areas to international standards within a limited timeframe.
Engineering Systems: Cleanroom Construction Addressing ISO 5 to 7 Particle Control
Under the challenge of a 4-month timeline across 3,000 sq.m., VOV’s engineering team executed the cleanroom construction , covering areas with varying cleanliness requirements from ISO 5 and 6 to 7 to match each production stage. Key Scope of Work highlights include:
Smart Air Filtration System: Installation of FFUs integrated with ULPA particle filters, controlled via precision software to manage the environment to strict standards.
Premium Protective Structures and Materials: Installation of PIR Walls with heat insulation properties and dust-free surfaces, along with Automatic Door systems.
Electronics Production Flooring System: Installation of Aluminum Raised Floors (AL) to facilitate under-floor systems and prevent static electricity impacts on HDD components.
Looking for an Expert in Cleanroom Construction for High-Tech Industries?
If your factory requires a production line upgrade or you are seeking a partner specializing in cleanroom construction who can meet specific requirements (Built-to-Suit) and manage timelines precisely without compromising quality, VOV International is ready to apply our international experience to manage your project from start to finish.
Contact our engineering team for project assessment: